The Project

Hutchinsons are the principal contractor and we are contracted to Value Added Engineering (VAE).

Advanced Insulation was contracted to VAE to carry out the following works:

  • The hotel will comprise 316 premium rooms, with the upper levels of the tower housing 423 one and two-bedroom residential apartments ranging in size from 54m2 to 109m2.
  • Works included insulation from L1 to L53, future chilled water connections for tower 2, plant rooms on level 2, level 2 mezz, level 20, level 53 and tying into the existing chiller plant room in the casino.
Destination Gold Coast Tower 1