Kingaroy Hospital
The Project Broad Construction has been appointed by the Queensland Government to construct the Kingaroy Hospital redevelopment which is located approximately 220km from Brisbane’s CBD.
Pre-insulated pipes are used to maintain the temperature of the fluid in these pipes. Advanced Insulation & Fabrications offers pre-insulated pipe systems for both heating and cooling systems. Polyurethane insulation provides the primary thermal resistance.
Applications for pre-insulated pipes
Some other major advantages of using by pre-insulated pipes are outstanding thermal efficiency, less on-site labour requirement, offer better quality insulation, due to which also reduces energy loss.
The Project Broad Construction has been appointed by the Queensland Government to construct the Kingaroy Hospital redevelopment which is located approximately 220km from Brisbane’s CBD.
The Project Hutchinsons has partnered with Ipswich City Council for the next stage of their ongoing regeneration of the Ipswich Central area into a world-class
The Project Hutchinsons are the principal contractor and we are contracted to Value Added Engineering (VAE). Advanced Insulation was contracted to VAE to carry out